**Design carried out entirely in BIM***
Selection of the ideal site based on the proposed needs.
Validation of the necessary utilities on the site.
Initial preliminary design for validation of the site: Architecture / engineering, utilities, required surface areas, environment.
Basic Project Phase
- Geometric definition of the building based on urban planning parameters
- Environmental Impact Studies
- Energy study of the building. Sustainability certification: LEED, BREEAM, WELL
- Coordination with Utility Companies – Utilities: Energy, Connectivity, Water, Gas
- Definition of management and Production of critical supply
- Proposal for Redundant power supply
- Cooling systems
- General service areas
- Fire Protection Systems (FPS)
- Data areas
Executive Project Phase
- Executive Project / Detailed in BIM
- Civil Works and Metal/Concrete Structures
- Interior and Exterior Architectural Design
- HVAC and Climate control Equipment
- Piping Layout
- Fire Protection Systems (FPS)
- Electrical Installations, MV, LV
- Renewable Energy Systems
- Cogeneration
- Life Cycle Analysis
- Sanitation and Wastewater Treatment
- Physical Security and Access Control
- Closed-Circuit and Internal Communication Systems
- Telecommunications – Voice and Data